Published by admin on Wed, 09/11/2024 - 9:24am
Keystone is moving forward with a sewer pipe expansion project. At the Sept. 4 Keystone Town Board of Trustees meeting trustees asked their town engineer to begin an application with the state water plan. The proposed $5.6 million dollar plan will update the existing pipe to 14 inches.
Currently the 10-inch pipe that is in place can handle about 690,000 gallons of flow.
Town engineer Zach Grapentine said cameras have shown the existing pipe is currently full.
“Based off data you guys are at capacity,” he said.